Sanitary Sewer Maintenance Program 2015

Larissa Morais
Larissa Morais

March 14, 2024

What is it about?

The Director of Public Works in United States, in Province of Oregon, is embarking on a Sanitary Sewer Maintenance Program for 2015.

  1. The PVC pipe supplied for Project 30-120 was defective and must be replaced. (Map 1)

    The PINK polyline is all the pipe that has PVC as material in the Project 30-120 that needs to be replaced. The ORANGE points are the centroids from the parcels of the maintenance program. The GREEN points are the centroids of the affected parcels, within 500 feet of the pipe to be replaced, as the Director has to notify the property owners of the replacement project.

  2. Acccording the sanitary sewers inspection, the concrete sewers require re-lining. (Map 2)

    The colorful thick lines are the concrete pipes, and it is represented by the size. For each diameter of the pipes there is a corresponding color. The replacement costs will be based on the length of pipe to be replaced.


Plug-ins used

no plugins

tags

Data PreparationData Visualization

You might also like

Join the community!

We're a place where geospatial professionals showcase their works and discover opportunities.